1
0
mirror of https://github.com/PDP-10/stacken.git synced 2026-03-01 09:21:15 +00:00
Files
Lars Brinkhoff 6e18f5ebef Extract files from tape images.
Some tapes could not be extracted.
2021-01-29 10:47:33 +01:00

251 lines
6.7 KiB
Plaintext

WEEKLY PM SCHEDULE
ASR-33 TELETYPE
BA10 COMBINATION CONTROL (CR10, LP10, XY10)
WEEKLY EXEC TIME: 0 USER TIME: 10
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary.
CP-10A CARD PUNCH
CR10A CARD READER
WEEKLY EXEC TIME: 0 USER TIME: 30
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary.
1.3 Run diagnostic DCCRA one pass in user mode with data switches set to zero.
1.4 Vacuum unit as required by amount of usage. Including read station and picker belts
1.5 Clean drive capstans with alcohol.
CR-10D,E,F, CARD READER
DC10 DATA LINE SCANNER
WEEKLY EXEC TIME: USER TIME: 10
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary.
1.3 Run diagnostic DCDCA one pass exercising one teletype.
DF10 DATA CHANNEL
WEEKLY EXEC TIME: 0 USER TIME: 10
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary.
DK10 REAL TIME CLOCK
DL10 10/11 INTERFACE
WEEKLY USER TIME: 10
1.0 Check all fans and blowers for rotation.
1.1 Check alL Filters and clean/replace as necessary.
KA10 CENTRAL PROCESSOR
WEEKLY EXEC TIME: 30 USER TIME: 60
1.1 Check all fans and blwers for rotation.
1.2 Check all filters and clean/replace as NECESSARY.
1.3 Run diagnostic DAKAD for 15 minutes.
1.4 Run diagnostic DAKEB for 15 minutes.
1.5 Run diagnositc DAKDA in user mode for 30 minutes.
KI10 CENTRAL PROCESSOR
WEEKLY USER TIME: 70
1.1 Check all fans for rotation.
1.2 Run DBKBD in user mode for 60 min.
KSR-35 TELETYPE
LP10C,D,E LINE PRINTER
WEEKLY EXEC TIME: 0 USER TIME: 40
1.1 Check all fans and blowers for rotation.
1.2 Vacuum entire unit.
1.3 Adjust print quality as required. Refer to appendix titled LP10, section 1. Using local test mode.
1.4 Inspect all drive trains for chipped teeth, loose pulleys, and worn or stretched belts.
1.5 Empty clutch residue boxes.
1.6 Clean code wheeL ANd vertical format assembly.
1.7 Run diagnostic DCLPA one pass in user mode.
1.8 Check that ribbon tracking mechanism is working properly.
MA10 CORE MEMORY
WEEKLY EXEC TIME: 0 USER TIME: 30
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary.
1.3 Run diagnostic DCMMD worst case pattern fast mode under user mode for 20 minutes.
MB10 CORE MEMORY
WEEKLY EXEC TIME: 0 USER TIME: 30
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary. Note: This includes stack filter.
1.3 Run diagnostic DCMMD worst case pattern, fast mode under user mode for 20 minutes.
MD10 CORE MEMORY
WEEKLY EXEC TIME: 0 USER TIME: 40
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary.
1.3 Run diagnostic DCMMD worst case pattern fast mode under user mode for 20 minutes.
ME10 CORE MEMORY
WEEKLY EXEC TIME: 0 USER TIME: 40
1.1 Check all fans and blowers for rotation.
1.2 Check allfilters and clean/replace as necessary.
1.3 Run diagnostic DCMMD worst case PATTERN fast mode under user mode for 20 minutes.
MF10 CORE MEMORY
WEEKLY USER TIME: 30
1.1 Run DCMMD using worst case pattern in user mode for 20 min.
1.2 Fans and filters.
MX-10 MEMORY MULTIPLEXOR
PCO PUNCH PAPER TAPE PUNCH
WEEKLY EXEC TIME: 0 USER TIME: 5
1.1 Vacuum chad box area as required.
PCO READER PAPER TAPE READER
WEEKLY EXEC TIME: 0 USER TIME: 5
1.1 Check cleanliness and condition of glass over photo cells.
RC10 DISK/DRUM CONTROLLER
WEEKLY EXEC TIME: : USER TIME: 10
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary.
RD10 BURROUGH'S DISK
WEEKLY EXEC TIME: 15 USER TIME: 10
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary.
1.3 Run diagnostic DCRDC HTEST, for 15 minutes in the maintenance sector.
RM10B BRYANT DRUM
WEEKLY EXEC TIME: 15 USER TIME: 10
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary.
1.3 Run diagnostic DCRMC htest, for 15 minutes in the maintenance sector.
RP02 DISKPACK DRIVE
WEEKLY EXEC TIME: : USER TIME: 10
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and replace as necessary.
RP-02S AND RP-03 DISKPACK DRIVES
RP10 DISKPACK CONTROLLER
WEEKLY EXEC TIME: 0 USER TIME: 10
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary.
TD10 DECTAPE CONTROLLER
WEEKLY EXEC TIME: 0 USER TIME: 20
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary.
1.3 Run diagnostic DCTDD for 20 minutes in user mode exerciSE one DECtape unit.
TM10 MAGNETIC TAPE CONTROLLER
WEEKLY EXEC TIME: 0 USER TIME: 40
1.1 Check all fans and blowers for rotation.
1.2 Check all filters and clean/replace as necessary.
1.3 Run diagnostic DCTHH in user mode one pass on one drive.
TU-10 PM
WEEKLY USER TIME: 10
1.0 Make sure operators are cleaning the following points daily:
head assembly, tape GUIDES, EOT/BOT assembly, tape cleaner, capstan, roller guides,
buffer columns, column door and glass, head cover, reel hubs.
TU20 MAGNETIC TAPE UNIT
DAILY
1.0 Check operator's cleaning.
WEEKLY EXEC TIME: 0 USER TIME: 45
2.1 Check all fans and blowers for rotation.
2.2 Check all filters and clean/replace AS Necessary.
2.3 Check drive belts for wear.
2.4 Check manual switch operation.
2.5 Check air column for foreign material.
2.6 Check pinch roller bearings for roughness.
2.8 Check capstan bearings for roughness.
TU30 MAGNETIC TAPE UNIT
DAILY
1.0 Check operator's cleaning.
WEEKLY EXEC TIME: 0 USER TIME: 45
2.1 Check all fans and blowers for rotation.
2.2 Check all filters and clean/replace as necessary.
2.3 Check drive belts for wear.
2.4 ChecK MAnual switch operation.
2.5 Check air column for foreign material.
2.6 Check pinch roller bearings for roughness.
2.7 Check rotary guide bearings for roughness.
2.8 Check capstan bearings for roughness.
TU40/41 MAGNETIC TAPE UNIT
DAILY
1.1 Check operator's cleaning of tape path.
TU55 DECTAPE UNIT
XY10 PLOTTER
VT05 VIDEO DISPLAY